28 October 2011

DAY 9 & 10 OF RENO

so gratful to tiler who redo the table top without much fuss. he has began titling work for the table top.

new table top, new measurements completed with tiles

markings and allowances for cabinet base

from 10", the distance between sink and stove is now 17"

i'm so happy with the before/after look... hopefully tiler can finish the cabinet base soon.
how to make gifs
raw look, tile finishing

as for aircon installation, works has stopped temporarily. the trunking and casing position are not what we visualise previously. even though we have spoken to the aircon guys prior installation, the trunking for this particular bedroom is really unacceptable.

why must the piping be extended across the doorframe and across to the left? why can it just be hiding by the corner just below the beam?

this in the mbr is seem ridiculous? trunking stopped 3/4 in the room, yet another outlet is being hacked for the unit from the left?

we are really new to these stuff and it's giving me a terrible headache being the messenger between the ID and the one paying for box-up and other services.

can i just wave my magic wand and let everything fall neatly, nicely yet practically in place?