electrician shifted the location of my kitchen's light switches and tidied up his work station.
the current switch location will get block by my swing door, so have to relocate it
tiler gotten more bags of cement, seems like he getting ready for kitchen and washing machine based.
the moulds for sink and hob are up. but i really cant accept the small space of 10inches between the water and fire so i requested he reconstruct the moulds with a distance of 15inches.
the moulds are up, see the small space between the sink and hob? it's not even enough to put a decent chopping board.
tiler even did a smooth finishing beneath the mould so that my hands wont be cut by rough edges.
really hate to request the tiler to reconstruct the mould but really got no choice as the space is unbearable.
tomorrow is holiday, will be heading to ID's office to confirm the laminate and color theme.
No comments:
Post a Comment