27 October 2011

DAY 8 OF RENO

it's back to work after yesterday's break.

we gotten the sink and stove to the unit as requested by the tiler to redo the table top. i was a bit worried the tiler would blew his top at me due to my fickle-mindedness to widen the space between sink and stove.

later the same afternoon, i was told by ID that the current sample top cant be used because the measurements of the sink and stove given in the catalogues are not accurate, the actual stuff cant be fitted into the mould?!

so, it's not entirely my fault if i've requested the tiler to redo the table. the issue now is the cut-out dimension given by the suppliers are inaccurate. thank god, i'm spared from a scolding from the tiler. anyway, this time round, i specifically and confidently told him i want a distance of at least 15-18" between sink and stove. no more, no less, no more changes.

i'm glad he made these for me within the same day.

new moulds for sink and stove

is this for sink or stove?

sink or stove? the indent is for tap? battery ignition?

aircon trunking was also being done today, the bedrooms are all done up but due to heavy downpour, outdoor work seems a bit delayed.

trunking left dangling on the aircon latch

trunking for bedroom 2 and 3, across hallway

trunking for study

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...