15 November 2011

DAY 27 OF RENO

the grilles are being installed today after we confirmed the deal with Invisys over the weekend.

can u see the grilles?

the nuts & bolts will be tighten after the wire are in place

the gap is approx 3.5"-4" apart. this is to avoid the handles on the casement windows

the hook to finalised the tension

online gif animator
with and without flash. did u notice the vertical thread - 'stabilizer'. acts an additional support and it's necessary if the length of the window is more than 2m

close up view of the stabilizer

but i would give it a 3.5/5 rating for their workmanship. some of the bars were slanted, and of one of it was drilled on the wrong side. the workers didnt replace instead just seal the correction with a stopper and some white silicon gel. paint on the wall and window framed peeled off due to drilling. of course, all this mistakes arent really visible unless you really pay attention to it.

anyway, the job for 3 bedrooms and 1 study room was completed within 150mins. finally, some peace of mind when it comes to my kiddos' safety.

btw, the 10mm tempered glass shower screen was also being installed today.

mbr's bathroom

common bathroom

just settled the windows, now there's another thing for me to remind the kids to be gentle with...zzz.

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...