08 December 2011

DAY 51 OF RENO

can you believe that is absolutely NO WORK DONE for the past 2 weeks?! i'm fed up of kpkb-ing at my ID to speed things up. and i think he's equally frustrated abt me breathing down his neck! so we hvnt call each other for the past 1 week - no calls, no sms.

a very naive me still believe that the place can be ready for x'mas. was very pissed when i had to postpone my shift in date from 19 dec (the best date to move according to my FSM) to 27 dec (an ok lah, good date).

anyway, i was here today to clear my mail when i notice my windows are open...mmh, so went up and finally - it's here. (my ID didnt inform me abt the installation).

a portion of my SGD4k feature wall! honestly, i dun like it cos it makes the whole place seems SMALL, and not forgetting, it blocks the air circulation and natural light.

my shoe/display cabinet. half way done - it's going to be way up to the ceiling.

base structure of my kitchen cabinets.

top structure of my kitchen cabinets.

as there's lot of tools and material on site and without a proper camera i merely took a few quick shot and make a haste exit as not to disturb the flow of work. will be back for more shots later this week.

No comments:

Post a Comment

Related Posts Plugin for WordPress, Blogger...